u型玻璃幕墙安装如下:
**:放线,找预埋件,
第二:开主骨料,装主骨料,
第三:装横料,
第四:装玻璃,
第五:打玻璃胶。
![1554961573888612.png wKhQwFd7oX6EJ3QDAAAAAFaOcwc242[1].png](https://static.dcodingmax.com/u/dcoding/xstore/2026/09/10/9e7d82bb6aac4c96b999daf5c6fefc51/1554961573888612.png)
The U-shaped glass curtain wall is installed as follows:
Number one: put the wire out and find the buried parts.
Second: open the main aggregate, load the main aggregate,
The third is to load horizontal materials.
Fourth, install glass.
Fifth: hit the glass glue.